Skip to main content
Accessibility tools





Contracts / Secondment

The Secondment area allows management of seconded contracts, offering the user the following options:

Available Options:

  • Modify – Modifying the details of an existing secondment.
  • Cessation – Closing an active secondment.
  • Cancel Cessation – Canceling a cessation performed on a secondment.
  • CancelCompletely canceling a secondment.

Specific Secondment Flows:

1. Modify Secondment

  • Step 1 – Selecting the seconded contract.
  • Step 2 – Entering the data for modifying the secondment:
    • End date of secondment (mandatory).
  • Step 3Summary verification and submission.